Experience, Experience, Experience
Bank One
The Bank One Project for the 17 floor office building began with a complete renovation of the core tower. Work then began on each floor as the owner abated the floors and relocated tenants.
Bible Center Church
A new sanctuary built to accommodate its more than 2000 members, including a day care facility and children's theater with complete card access, flat screen TV's for every application, theatrical lighting and sound systems. Upon entering the enormous gathering area at the main entrance with a stone fireplace and high tech lighting systems makes even a stranger feel welcome. Upstairs is comprised of adult classrooms and meeting rooms with high speed data access overlooking the sanctuary. Inside the sanctuary, separate theatrical lighting controls and audio/visual systems give the congregation modern capabilities.
BORG WARNER TECHNICAL CENTER
This research and development facility represents sophisticated technology coupled with a fresh, inviting facility design.
CAPITAL HIGH SCHOOL
The 230,000 square foot Capital High School Complex is one of our most aggressive projects. Comprised of two separate structures containing 12 different areas of construction, including a gymnasium, TV studio, science center, and theater.
CHARLESTON AREA MEDICAL CENTER SPECIAL CARE FACILITY
The 132,000 square foot facility contained some of the most sophisticated electrical systems of the time. Progressive Electric installed electrical systems for operating rooms, CT scanners, MRI procedures, and a lithotripter facility.
DIAMOND BUILDING
The renovation of the 256,000 square foot Diamond Department Store for the State of West Virginia represents our largest design-build project to date. The original facility was completely retrofitted to accommodate the modern technology required in today's office facilities.
Jackson & Kelly
The seven (7) floor renovation for the law firm of Jackson & Kelly, located in Laidley Tower, was completed in 9 months. Each of the four phases were overlapping 9 week durations, and had to be coordinated with the owner, who occupied the space during construction.
Judge Donald F. Black Courthouse Annex
The construction of the new Courthouse Annex in Parkersburg, WV, first consisted of demolishing the internal structure of the existing Town Square Building. This building had a variety of uses, including law offices, restaurants & movie theaters. New-age lighting and a fiber optic backbone for communications were installed between the existing Annex & Courthouse buildings.
LAIDLEY TOWER
This 236,000 square foot hexagonal-shaped office complex rises 255 feet and dominates the skyline of West Virginia's capital city.
Lincoln County 911
This design build 911 center is equipped with dual sources for all utilities including tele/data & electrical power service. It also has a generator that is capable of backing up the entire building with a UPS system to ensure critical loads never lose service. This project is the first of its kind for the region it serves and will be a pioneer for rural areas in the future.
MAN K-8 SCHOOL
The new K-8 school located in Man, WV is a 75,000 square foot facility that serves the Logan County area.
Marshall University — Smith Hall Renovations
This work included a replacement of the existing switchgear and secondary distribution for both normal and emergency power. In addition a complete fire alarm notification system as well as new HVAC equipment throughout was installed for this high rise building located in Huntington, WV.
MCJUNKIN CORPORATE HEADQUARTERS
This 80,000 square foot office complex represented a state-of-the-art office environment, including computer controlled lighting, under-carpet wiring, and a HALON system for computer areas.
Steptoe & Johnson Corporate Office
The tenant fit out for the 4th & 5th Floors of the new United Center in Morgantown, WV was completed in 12 weeks. This included a fully equipment modern law offices, suites & conference rooms. The tenant fit our for the 3rd Floor of the Bank One building in Huntington, WV was completed fully occupied. This project was a renovation of selected areas for growth & expansion in the areas market.
TRI-STATE RACE TRACK AND GAMING CENTER
The 55,000 square foot addition and renovation to the center was completed in record time. The addition included space for gaming machines, a restaurant, bars, and a simulcast area.
West Virginia Museum of Culture & History
Over four hundred dimmed lighting circuits tied into four dimming cabinets, two relay racks and controlled with DMX Unison programmers, occupancy sensors and tied into an audio system that tells about each exhibit when you enter each specific area. With many exciting artifacts to see in the beautiful museum that outlines life and the many accomplishments of West Virginians past and present, perhaps the most exciting are the electrical, lighting & audio systems that most definitely do not go unnoticed.
West Virginia Power Minor League Baseball Stadium
The $23 million performance specification facility for the Class A minor league baseball team was completed in record time. Work included a state-of-the-art sound system, luxury sky boxes, concession buildings, and press box.
WESTERN REGIONAL JAIL
The 175,000 square foot jail in Barboursville, West Virginia consists of four pods with each one housing approximately one hundred inmates.
Winfield High School HVAC/Electrical Renovation
The entire fire alarm, lighting, and HVAC system for the 30 year old school had to be completely removed and upgraded during the 13 week summer period.
Yeager Airport Parking Garage
The new 706 space parking garage at Yeager Airport was a design-build project with a fast paced schedule. The project required tremendous coordination from all contractors, as well as the owner and owners engineering representatives.

